The richest man: I really don’t want to make money.
Chapter 1207 10 dormitory buildings
"Yes, all houses are built in this way. This kind of house is quick and easy to build."
"After all, desert planting research will also go to different areas and will change locations frequently. There is also the issue of funding, which is not enough to support the construction of better housing."
Zuo Wentao spoke slowly.
Sand control is a very hard job, and the daily necessities of life such as food, clothing, shelter and transportation cannot be greatly satisfied.
Working in the desert every day, any clothes will become covered with dust after a day's work.
In terms of hygiene, due to the lack of sufficient water resources, taking a shower is a very luxurious thing.
Not to mention the food, all the vegetables here need to be transported from outside, and basically a week's worth of vegetables are delivered at one time.
There is no way to guarantee the freshness of vegetables.
All those who can participate in sand control work are worthy of respect.
"So if we want to build a large dormitory building here, is it possible to do it?"
Chen Mo thought about it and then asked.
Whether it is for the purpose of spending money or improving the working environment of sand control workers, it is very necessary to create a good accommodation environment.
“Of course it can be done, but it may require a lot of investment.”
"Let's not talk about construction. Water resources are a very difficult problem to solve. Although we can dig wells here, the water from the wells is not drinkable. Most of the water is transported from outside."
"There is also water and electricity. The power supply here is not very sufficient. If a large dormitory is built with too many electrical equipment, there may be a shortage of power supply."
"Also, the network base stations here are not fully built, and there is no way to cover the network."
Zuo Wentao briefly explained the current situation.
Chen Mo couldn't help but curl up his lips when he heard this. This was a point that would consume a large amount of funds.
Since water resources are insufficient, he can just buy a lot of water from outside and transport it here.
The network base station coverage was incomplete, so he invested money to cover it.
As for electricity?
It is also possible to install a large electric motor. If that doesn't work, you can build a power station.
Chen Mo thought to himself that from this aspect, he had already seen where a lot of funds were being wasted.
After visiting the accommodation, everyone headed towards the desert.
"Mr. Chen, if you really want to carry out the edge-locking project, you should start from here."
"It is currently expected that different edge-locking technology arrangements will be used depending on the desert terrain, with widths ranging from 50 to 100 meters."
"I will come up with a desired hemming plan in the next few days, and I will also help you recruit some staff here."
"........"
While walking in the desert, Zuo Wentao introduced the border locking plan and some key points of desert management.
When all the important matters have been discussed, the future work is basically determined.
Chen Mo no longer cared about the desert oasis project. Since he came to the desert, he must carefully experience the local customs and culture of the desert.
I rode a camel and saw cacti in the desert that I had only seen on TV.
And camping in the desert to watch the sunrise and sunset.
Three days later,
dormitory.
In a temporary meeting room.
"We have been in the Taklimakan Desert for three days now, and we have already understood the future work content and working environment."
"It's very hard and boring, so I'm giving you one more chance to choose. If you regret it and don't want to work here, you can go back with me tomorrow."
"Don't worry, I won't say anything. After you go back, you will work in the positions you are supposed to work in. There will be no changes."
Chen Mo looked at all the team members in the room and spoke slowly.
Although he spent the three days here having fun, he also felt the hardships of working here in the future.
The big temperature difference between day and night, the dust blowing from time to time, and the need to save water all the time...
So he gave everyone in the room a chance to choose again.
The words fell,
There was silence in the room. Everyone looked at each other, but no one spoke.
Chen Mo waited quietly for a while and saw that no one spoke.
"Since no one is saying anything, I will assume that everyone agrees to work here."
"I also see how hard you work here, so everyone present here, your salary will increase by 50% on the original basis."
"Also, we have already started recruiting staff. All of you will be managers of the Desert Oasis Project in the future. As more people are recruited, your positions will become higher."
Chen Mo said seriously.
Working in such a tough environment, the salary must be increased.
After talking about salary and benefits, Chen Mo's eyes fell on Wei Yan and Li Shen.
"The current staff dormitory does not meet my requirements in terms of the number of people it can accommodate or the facilities it has."
"First of all, the dormitory building can only accommodate 400 employees at most, and both the desert oasis and the hemming project are very large projects."
"It is far from enough to rely on just 400 employees, so it is very necessary to rebuild the staff dormitory."
"Through our understanding over the past few days, we have completed the edge-locking project, and the final circumference is more than 3000 kilometers."
"If we only build the staff dormitory in one place, it will be difficult to carry out the hemming project in a distant place, and it will take a long time to travel every day."
“So I made a decision to build the staff dormitory building in sections, just like the well houses on the desert highway.”
"The total circumference is more than 3000 kilometers. We will build a staff dormitory building every 300 kilometers. The employees in each staff dormitory building will have to lock the 150 kilometers of edges on both sides of the dormitory."
"So there are a total of 10 staff dormitory buildings, and each staff dormitory building can accommodate 5000 employees."
"The requirements for dormitory construction should match those of the staff dormitories in Jiangcheng. However, due to water resource issues here, we must make adequate preparations for water supply."
"There are also electricity requirements. Large generators can be used in the short term, and later on, a power station can be set up."
"It's the same with the Internet. The employees here are already working very hard, and in this deserted desert, if there is no Internet to connect with the outside world, problems will arise over time."
"........"
You'll Also Like
-
Horror revival: A ghost call at the beginning!
Chapter 134 16 hours ago -
Infinite Reincarnation: Survival Begins from Ishimura
Chapter 614 16 hours ago -
Investment Return: From Refugee Camp to Supreme Divine Dynasty
Chapter 161 16 hours ago -
Start invincibility from the attribute panel
Chapter 985 16 hours ago -
Tomb robber: Tuantuan, I am a national treasure!
Chapter 194 1 days ago -
Traveling through the world of beasts: After binding to the childbearing system, I was loved by the
Chapter 424 1 days ago -
I broke off the relationship on the day of my rebirth and became a trillionaire
Chapter 445 1 days ago -
Zongman: Being the leader in the wild world
Chapter 340 1 days ago -
My whole family is in the book, I'm cheating, the female supporting role in the control group i
Chapter 478 1 days ago -
Back to 1988: I became the world's number one surgeon
Chapter 484 1 days ago